A10 Motorway: Sebes - Turda
Length: 70.00 km. Status:
Color map: Open (100%); under construction (0%); planned (0%).
A10 is a motorway which connects Motorway A1 to Motorway A3 following the route Sebes - Turda. A tender was announced for section Sebes-Turda in July 2013; tender results were announced in December 2013.
For detailed information please choose a section from the list below:
Section | Status | Opening |
I.Sebes-Turda | Open | Jul 2018, Dec 2020, Nov 2021 |
I.Sebes-Turda
Status: Open
Length: 70.00 km
Opening Dates: Segments 3 and 4 were opened in July 2018; 15.5km on segment 1 was opened in December 2020; November 2021 for the remainder of segment 1 and for segment 2
A10 is a motorway which connects Motorway A1 to Motorway A3 following the route Sebes - Turda. A tender was announced for section Sebes-Turda in July 2013; tender results were announced in December 2013.
Section Sebes-Turda is split in four segments:
- Segment 1 - 17.00 km from Sebes to Paraul Iovului, contractors: SC Impresa Pizzarotti & C SpA - SC Pomponio SRL. Cost: 541,739,137 RON excluding VAT
- Segment 2 - 24.25 km from Paraul Iovului to Aiud; contractors: Aktor SA - SC Euroconstruct Trading SRL. Cost: 549,332,494 RON excluding VAT.
- Segment 3 - 12.45 km from Aiud to Decea, contractors: Tirrena Scavi SpA, Societa Italiana per Condotte d'Acqua S.p.A. Cost: 420,511,921 RON excluding VAT.
- Segment 4 - 16.30 km from Decea to Turda, contractors: Porr Construct SRL, Porr Bau GmbH. Cost: 470,004,894 RON excluding VAT.
|
Back to A10 sections list
(C) 130km.ro / Back to Romanian Motorways list
|
|