									 A14 North Motorway: Oar - Suceava
Length: 335.0 km (estimated). Status:      
Color map:    Open (0%);    under construction (3%);    planned (97%).
 
A14 North Motorway is a motorway planned with the route Oar (at the border with Hungary) - Satu Mare - Baia Mare - Dej - Bistrita - Vatra Dornei - Suceava. 
 
 For detailed information please choose a section from the list below:
									
									 I.Oar - Satu Mare (expressway)| Status: Under construction, the rest planned 
 Length: 10.83 km
 
 Opening Date: 2027
 
 A tender for a section of 10.83km between Oar and Satu Mare, known as Somes Expres, was launched in January 2024. Contractor selected in March 2025: Constructii Erbasu SA, cost: RON 720.48 (excl. VAT), duration: 24 months. Contract signed in October 2025.
 
 
 | 