130km.ro

Welcome. On this site you can view information concerning existing and future Romanian motorways.



A2 Motorway Bucharest - Constanta

Length: 202,79 km. Status:

Color map: operational (100%).

The A2 Motorway, also called the Sun Motorway, connects Bucharest to Constanta, through Cernavoda. The full length of the motorway is open.
For detailed information please choose a section from the list below:

SectionStatusOpening
I.Bucharest - CernavodaOpen1987, 2004, 2007
II.Cernavoda - MedgidiaOpenJul 2012, Nov 2012
III.Medgidia - ConstantaOpenJul 2011, Sep 2011, Jul 2012

I.Section Bucharest - Cernavoda

Status: Operational

Length: 151,48 km


Opening dates:
- 1987: Fetesti - Cernavoda, 17.58km
- 2004: Bucuresti - Fundulea, 26.50km, Fundulea - Lehliu, 29.20km and Lehliu - Drajna, 41.60km
- 2007: Drajna- Fetesti, 36.60km

Back to A2 sections list


II.Section Cernavoda - Medgidia

Status: Open

Length: 20.49 km

Contractors Astaldi and Max Boegl selected in September 2011. Section cost was 618.4 Million RON. The section was opened with two lanes in July 2012 and four lanes in November 2012.


Back to A2 sections list


III.Section Medgidia - Constanta

Status: Open

Length: 30.82 km


The contractors for this section are Astaldi and Max Boegl, while the cost is 739 Million RON. The stretch between Murfatlar and Valu lui Traian (14.5 km) was opened with two lanes in July 2011, and with four lanes at the end of September 2011. The entire Medgidia - Constanta section was opened in July 2012.


Back to A2 sections list


(C) 130km.ro / Back to Romanian motorway list