DEx16: Arad - Oradea - A3 Expressway
Length: 136.97 km (including a 3.50km motorway section connecting A1 motorway at Arad to DN7, section called A11). Status:
Color map: Open (12%); under construction (0%); planned (88%).
The main route of this project is the DEx16 Arad - Oradea expressway. Am additional connecting route, called the A11 motorway (3.50km), between A1 motorway at Arad and DN7, of 3.50km, was opened in June 2012. The connection between Oradea and A3 motorway at Bors is under construction (13km out of a total of 18.96km will be an expressway; the remainder will be a national road).
For detailed information please choose a section from the list below:
I.Arad - Oradea
Status: tender in progress
Length: 120.47 km
Opening Date: -
This route is split into three sections:
- Section 1 Oradea - Salonta, 33.7km (and an additional connecting road of 5.3km between DN79 Oradea - Arad and Salonta)
- Section 2 Salonta - Chisineu Cris, 39.7km (and an additional connecting road of 10km with the border with Hungary)
- Section 3 Chisineu Cris - Arad, 47.07km (and an additional connecting road of 2.9km with Arad Vest Industrial Area)
|
Back to DEx16 sections list
II.Oradea - A3
Status: open
Length: 13.00km as expressway, the remainder up to 18.96 as national road
Opening Date: March 2024
|
Back to DEx16 sections list
I.Arad/A1 - DN7 (A11)
Status: open
Length: 3.50 km
Opening Date: Jun 2012
The connection between A1 motorway at Arad and DN7 is called the A11 motorway, has a length of 3.50km and was opened in June 2012.
|
Back to DEx16 sections list