 DEx6 Braila - Galati Expressway and Braila Bridge
Length: 12.29km. Status:  
Color map:  Open (0%);  under construction (100%);  planned (0%).
This expressway will connect the cities of Braila and Galati and has a planned length of 12.29km. The contractor was selected in September 2020 and is the consortium SA & PE Construct SRL - Spedition UMB - Tenostrade SRL, price: 371,416,131.09 RON excluding VAT, execution duration: 10 months for design, 24 months for execution, opening date: 2024. Contract signing took place in April 2021.
The route of the expressway is continued with a bridge over the Danube between Braila and Smardan in Tulcea county, which was opened in July 2023. This bridge is not part of the Braila - Galati expressway. The contract was signed in January 2018 with the consortium Astaldi - IHI Infrastructure Systems, price: 1,995,932,260.25 RON excluding VAT, execution duration: 12 months for design, 36 months for execution, opening date: July 2023.
For detailed information please choose a section from the list below:
I.Braila - Galati
Status: Under construction
Length: 12.29km
Opening Date: 2024
Contractor: The consortium SA & PE Construct SRL - Spedition UMB - Tenostrade SRL, price: 371,416,131.09 RON excluding VAT, execution duration: 10 months for design, 24 months for execution, opening date: 2024. Contract signed in April 2021.
|
Back to DEx6 sections list
II.Braila Bridge
Status: Open
Length: 1.97km
Opening Date: Jul 2023
Contractor: The consortium Astaldi - IHI Infrastructure Systems, price: 1,995,932,260.25 RON excluding VAT, execution duration: 12 months for design, 36 months for execution, opening date: 2022. Contract signed in January 2018.
|
Back to DEx6 sections list